The Test

hybrid-setup-2

Hybrid Solution vs Generator only

We conducted a comparison using data from a 28-day operation at a client’s site. While we only installed and operated a hybrid system consisting of a 60kVA generator and a 45/60 Battery Energy Storage System, we compared its performance against a standard diesel-only generator setup using industry-standard data.

All rental and operational costs for the hybrid model were monitored, and these results were then compared to the typical data from a conventional diesel generator package.

  • Generator Run Time
  • Fuel Consumption
  • Fuel Costs 
  • Equipment Rental Costs 

The Results

Performance Comparison: Conventional Generator vs. Hybrid Power

Equipment installed: 60kVA Stage V Diesel Generator & 45kVA / 60kwh Battery Energy Storage Unit.

In a controlled 28-day comparison, with a fuel cost of £1.50 per litre, the fuel consumption was 7 litres per hour.

Title

Reduction in run time:
463.36 hours
 

Fuel costs saved:
£4,867.85
 

Total costs saving:
£2,217.85
[rental & fuel]

The Results

Performance Comparison: Conventional Generator
vs. Hybrid Power

A 28-day controlled comparison was conducted using the following equipment: 
a 60 kVA Stage V diesel generator and a 45 kVA/60 kWh battery energy storage unit.

hybrid-setup
Conventional Generator

case-NEW2-micro-pic-1
Hybrid Power

case-NEW2-micro-pic-2
Run time (hrs) 672 hrs 208 hrs
Fuel consumption per hour: 77
Cost per litre£1.50£1.50
Fuel cost£7,056£2,188.15
Rental costs£850£2,650

The Impact

Hybrid power vs generator

infographics-01-1

Run Time Reduction

infographics-05

reduction in run time

infographics-04

Fuel costs saved

infographics-02-1

total cost savings

[fuel & rental costs combined]

infographics-03-2

CO2 savings

mobile-hybrid-power-from-summit-power

Over the 28 days, the hybrid generator installation demonstrated a 69% reduction in fuel consumption, translating to £2,217.85 in total cost savings and a significant decrease in emissions.

Your Temporary Power

Could you save 69% in operating costs?

If you would like a review of your temporary power requirements and demand, Summit Power can help. We can advise on the most cost effective and sustainable solution Contact our team today and discover the Summit Power Advantage

📱 0333 034 9433
📧 [email protected]
🌐 www.summitpower.co.uk

20 kva all loaded up

The Impact

£5,498.41

fuel cost savings

68% Run Time Reduction
£5,498.41 Fuel Cost Savings

Over the 20 days, the hybrid generator installation demonstrated a 68% reduction in fuel consumption, translating to £5,498.41 in cost savings and a significant decrease in emissions.

Generator_150kva(Silent)_main

Your Temporary Power

Could you save 68% in operating costs?

If you would like a review of your temporary power requirements and demand, Summit Power can help. We can advise on the most cost effective and sustainable solution

Contact our team today and discover the Summit Power Advantage

📱 0333 034 9433
📧 [email protected]
🌐 www.summitpower.co.uk

Generator_150kva(Silent)_main

Switch on to Summit Power.

Explore our products and services

Make an Enquiry

Make an Enquiry